December 2025

TENPOWER 18650 30XG

Introducing the INR18650-30XG High-Performance Lithium-Ion Cell 

At BECELL, we are proud to offer the INR18650-30XG, a high-performance rechargeable lithium-ion cell from TENPOWER, designed for applications requiring reliable power, high discharge rates, and long cycle life. This 18650 cell features a robust steel casing and a compact form factor, making it suitable for a wide range of devices including high-drain electronics, power tools, […]

Introducing the INR18650-30XG High-Performance Lithium-Ion Cell  Read More »

relince 21700 rh60

BECELL Introduces the Future of Power: Reliance INR21700-RH60 High-Capacity Lithium-Ion Cell

We at BECELL are proud to introduce the latest innovation in rechargeable battery technology: the Reliance INR21700-RH60 high-performance lithium-ion cell. Manufactured by Jiangsu Reliance Energy Tech. Co., Ltd., this next-generation 21700 cell is now available for pre-order ahead of its official mass production in March 2026. Product Overview The INR21700-RH60 is a high-capacity cylindrical lithium-ion cell with a minimum capacity of

BECELL Introduces the Future of Power: Reliance INR21700-RH60 High-Capacity Lithium-Ion Cell Read More »

EVE INR21700-50PL: Introducing the New & Improved Generation for Consistent Performance

We are excited to announce a significant upgrade to a popular high-power cell: the EVE INR21700-50PL. As a trusted partner with priority access to EVE’s latest production batches, we are now accepting advance orders for the newly enhanced version, which is set to begin shipping in early 2026. Addressing a Known Challenge The INR21700-50PL has

EVE INR21700-50PL: Introducing the New & Improved Generation for Consistent Performance Read More »

Act Now: Rising Battery Prices Make Early Procurement Essential

The lithium-ion battery market is entering a period of significant cost increases. Driven by sustained rises in key raw material prices, manufacturers have begun issuing official price adjustment notices for battery batches scheduled for production from December 2025 and January 2026 onwards. The Core Driver: Soaring Raw Material Costs Recent months have seen a sharp

Act Now: Rising Battery Prices Make Early Procurement Essential Read More »

Scroll to Top